Running Mass Protocol Base Building w/ Operator
Posted: Mon Jul 26, 2021 4:44 pm
Hello all, This might be a dumb question, but here it is...
I am currently running TBII Operator and I would like to transition over to Mass Protocol General after this cycle. Would it be alright to run the Mass Protocol Base Building template at the same time as TBII Operator?
My current lifts are as follows:
Bench - 210lbs
Squat - 260lbs
Deadlift - 300lbs
My cardio is lacking at the moment.
BW - 185lbs with some fat to lose.
Nutrition at the moment is a slight caloric deficit, but If I run these two together I would for sure beef up the calories.
Any thoughts would be great... Even if it is telling me I am a dumb ass.
I am currently running TBII Operator and I would like to transition over to Mass Protocol General after this cycle. Would it be alright to run the Mass Protocol Base Building template at the same time as TBII Operator?
My current lifts are as follows:
Bench - 210lbs
Squat - 260lbs
Deadlift - 300lbs
My cardio is lacking at the moment.
BW - 185lbs with some fat to lose.
Nutrition at the moment is a slight caloric deficit, but If I run these two together I would for sure beef up the calories.
Any thoughts would be great... Even if it is telling me I am a dumb ass.