OMS with floating schedule
Posted: Sun Jul 14, 2024 10:29 pm
I’ve been running TB for a year and a half now, and I have been mostly using OP I/A due to the flexibility with my work schedule, which is 48 on 96 off. I would like to run OMS but I’ve become partial to the floating schedule style of OP I/A. I’ve read in this forum and in an article from KB, that you can. Increase reps in operator for a lagging lift. Could I just do this across all my lifts in Op I/A? (except for DLs) I know that I could just push the amount of sets higher, but this isn’t always possible if I’m on a time crunch.
As for specificity I was thinking of running the normal OP I/A with two day breaks, and one of those days could be my hypertrophy day. So it would look like this:
-Max strength
-hypertrophy
-rest or black conditioning from mass
-repeat
Is this a good idea or is this blasphemous?
As for specificity I was thinking of running the normal OP I/A with two day breaks, and one of those days could be my hypertrophy day. So it would look like this:
-Max strength
-hypertrophy
-rest or black conditioning from mass
-repeat
Is this a good idea or is this blasphemous?