I'm Mike.
First I bought TB I, and started reading the book. Then, before I finished it, I bought TB II, and the Green Protocol. Read all three, and decided to start with TB I Operator Template.
I'm not new to lifting, neither training.
The plan I set up looks like this:
GOAL: Max Strength
PLAN: OPERATOR
DURATION: 12 weeks*
* 12 wks end date NOV 10
----------------------------------------
STARTING Numbers (1 RM)
Deadlift: 170 kg (375 lbs)
Bench Press: 90 kg (200 lbs)
Back Squat: 100 kg (220 lbs)
Weighted Pull-up: 20 kg (45 lbs)
----------------------------------------
CLUSTER
DAY 1: SQ/BP/WPU
Day 2: SQ/BP/WPU
Day 3: SQ/BP/DL x 3 work sets
----------------------------------------
SCHEDULE
MON: OP
TUE: E*
WED: OP
THU: E*
FRI: OP
SAT: E**
SUN: Rest/Active Recovery***
OP=Operator; E = Endurance
* LSS Running, 60-90 minutes
** Rucking
*** Swimming (optional)
----------------------------------------
The plan looks like the one from Green Protocol/Capacity, and since it can be done as alternate to the Base Building, so it will be treated as Base Building plan.
But before I jump into it provide you with what I do now over the next week. I'm starting the above plan on Aug 19 since I'm on vacation
